Daily build sessions, deployment journals, debugging notes, and weekly summaries from active production AI work. Lightweight format — written during or immediately after execution.
15 entries · ordered by date
May 2026
Complete product operational timeline documented — 5 major build phases, 3 documented failures resolved, Gemini rate limit UX handling in place, custom domain active.
Complete product operational timeline documented — 6 major build phases, 4 documented failures resolved, payment integration live, custom domain active.
Organization + WebSite schema deployed via WPCode. Three Gutenberg homepage sections added: AI Execution Lab feature, ecosystem architecture (3-column), authority CTA. Footer 'Our Work' widget live. About page 'Built in Public' paragraph added. Internal links added to 5 top posts. LiteSpeed full cache purge completed. All 7 verification gates passed.
WordPress ecosystem rollout complete: homepage, footer, navigation, 5 blog posts, case studies page, about page all updated and verified. 4 of 5 target posts updated; ScamCheck post already had Lab links.
Shipped lib/content-intelligence.ts, lib/platform-intelligence.ts, app/ops/intelligence/, 6 new signal detectors, GEO dashboard. TypeScript clean across all files.
First live telemetry data captured: 5/5 properties up, 313/313 sitemap URLs passing. Real metrics baseline document published. Lighthouse deferred (PSI quota). GSC ingestion pending CSV export.
Identified 5 live HTML injection instances (wpautop/HFE), confirmed sitemap 404, generated phpMyAdmin cleanup query set, documented LiteSpeed cache behavior, produced WPCode fix for wpautop injection.
Clean deployment: 424 pages, confidence scoring live, execution pathways live, /ops observability upgraded.
Full operational memory infrastructure shipped: entity graph, failure memory, GEO intelligence, evidence scaling
Publishing infrastructure complete: 6 content templates, lib/content-templates.ts, /publish hub page, operational publishing playbook, content velocity system doc. Platform now operationally ready for live publishing mode.
Reviewed Gemini API usage patterns, identified one UX friction point in the scan flow, confirmed Firebase auth working correctly, noted 2 improvements for next sprint.
Operational state reviewed: deployment healthy, Razorpay sandbox integration complete, Firebase auth stable, payment flow testing pending.
Resolved 3 WordPress site health warnings, updated Organization schema, corrected 2 internal link anchor texts, identified 4 GSC coverage gaps for manual review.
149-page build passing, 7 section index pages now have full OG/Twitter/canonical metadata, 3 new operational docs published
99 → 103 pages shipped. Failure Archive live with 3 real incident reports.